André Rast

André Rast CKW

André Rast have been working in the field of metering at CKW for around 16 years. During this time he has held various positions. He is currently head of the smart meter program and head of the certified E28 test laboratory. The main tasks in the past were:

  • Establishment of a program organisation for the preparation of the smart meter rollout.
  • Supporting the development of the smart-me module (used for online visualisation of meter data for the Kamstrup Smart Meter)
  • support and introduction of EDM system Robotron ecount
  • Evaluation and introduction of meter connection terminal
  • Development of third-party metering business
  • Integration of two test laboratories
  • Support and implementation of new functions of the load control system
  • Evaluation of various smart meter technologies
Speaker Details
  • Profession

    Program Manager Smart Meter Rollout

  • Company

    CKW -Centralschweizerische Kraftwerke AG

  • Country

    Switzerland